Every dollar. Every job. Accounted for.
Four connected systems close the gap between what happens in the field, what the office approves, and what the books show.
Your Real Cost
What does a yard of concrete really cost you?
BuildMetrx keeps your real cost for every kind of work you do, by the yard and by the square foot.
Sample numbers
01 — Price Intelligence
CostMetrx
Built from approved invoices only. Every item carries a current price, an all-time low and high, and a price history you can read at a glance. A sharp move off an item’s normal price raises an alert, so you see which vendor is raising prices before it costs you more than you usually pay.
- Biggest movers surface automatically, climbing and falling, so a price shift shows up before it reaches your next order.
- The current price is set per unit—per sheet, roll, or cubic yard—and built so one odd invoice cannot skew it.
- Every item opens to its own history: spent, quantity bought, current price, all-time low and high, and the date of the last purchase.
02 — Production Rates
What A Unit Of Work Really Costs
The real cost of a unit of work, per cubic yard, square foot, or each, from your own jobs’ real numbers.
- One number per field covers everything the work took, from your own jobs’ real numbers.
- Price the next job from what the work really cost you, not a cost book and not a guess.
- Every job you finish makes the next bid easier.
03 — Invoice Review
Automated Invoice Processing
Invoices are uploaded, matched to the right catalog item, job, and cost code, and approved from one queue, without anyone chasing paper.
- Upload a batch and each line links to a catalog item automatically. Names are learned from your own review picks and merges, vendor by vendor.
- Job defaults auto-fill the cost code on matching lines at upload, so coding happens before anyone opens the invoice.
- The review screen puts the PDF beside the extracted lines with a confidence score on each one, so a person only touches what the reader was unsure about.
04 — Live Job Costing
Live Project Updates
Every job carries its own running total the moment an invoice is approved. Actual spend, this month against last, and a month-by-month picture of where the money went, with no waiting for month-end close.
- Actual spend is the approved line-item sum, so the job page and the invoices page always agree.
- Spend by month and by cost code sit on the same page, so a spike shows both when it happened and what it was.
- Every job page links straight to its invoices and daily reports, so any number can be traced back to the document behind it.
05 — Field Operations
Field Logs
The superintendent’s daily report of weather and crew takes about two minutes per job, filed straight from the field.
- Weather and manpower captured on one screen, with a flag when weather delays the work.
- Man-hours roll up per report—today, previous, and from start—so labor history is never reconstructed later.
- A daily board shows which jobs have filed and which have not, and crews sign out materials from the same place.
06 — Cost Control
Budget
Set the number once, per job and per cost code. From then on every approved invoice is measured against it, and the jobs table shows budget, actual, what’s left, and budget used for every job side by side.
- CSI-style cost codes, or your own structure, applied consistently across every job.
- Lock a baseline and the projected-versus-actual curve tracks it, so you know whether a job is ahead of or behind its plan.
- A job with no budget says so on its own page, so nothing runs without a number to run against.
07 — Estimating
Takeoffs
List quantities by trade, then price them with what the same work cost you on past jobs.
- Type each line or paste it from a spreadsheet, and the estimate totals as you go.
- Each line is priced with your own unit costs, or a price you type.
- Bid close enough to win without giving up your margin, because every number comes from your own records.
08 — Planning
Scheduling
Lay out each job’s work and crews on one schedule. Size durations from your own production rates, so the plan matches how fast your crews actually work.
- See each job’s tasks and crews on one calendar, by week or by month.
- Turn a takeoff quantity into a duration based on how long the same work took your crews before.
- Late tasks are flagged, so you can move crews before a delay starts costing you money.
09 — Materials
Inventory
What’s in stock, what’s signed out, and what to order next. Track material across the yard, the warehouse, and every truck, valued at the latest invoice price you paid for it.
- Stock on hand valued at the latest invoice price, split by storage location.
- Crews sign material out to a job and return what they do not use, so shrinkage has a paper trail.
- Set a minimum per item and the low-stock list writes itself.
10 — Owned And Rented Assets
Equipment
Owned and rented equipment side by side, with the rental meter in view before it runs away with the budget. Machines on rent are matched to their rental invoices by serial or fleet key, so rental dollars land on the right job.
- Every machine carries its job, so sign-outs and returns show where it is and what it is costing today.
- Overdue returns are flagged with a running weekly rental cost, so nothing sits on rent unnoticed.
- What a machine cost on a job is carried into the real cost of the work it did.
11 — Vendor Intelligence
Vendor Tracking
Spend and purchase history for every vendor, built from approved invoices only. See who you buy the most from, how that spend is trending, and which supplier has the best price right now on every item you buy from more than one.
- Vendor aliases are matched automatically, so one supplier billing under two names still reads as one history.
- Auto-tagging defaults per vendor fill in the cost code on new invoices, so there is less to type at review.
12 — Payroll Record
Timesheets
Who worked, where, and at what rate. Crews clock in and out on their phones or at a clock-in station on site, and what the time was spent on lives on each job’s daily report.
- Clock in from a phone or a shared clock-in station, with an optional face check on each punch.
- Need to fix a day? Type clock-in and clock-out straight into any day, even one saved weeks ago. Lunch minutes are unpaid and deducted, and hours compute as you type.
- The week runs Monday to Sunday so it lines up with the overtime week on the pay summary, and past-40 hours are flagged automatically.
- A worker without a rate logs no dollars, so the rates-set counter tells you exactly what is missing before payroll closes.
See It With Your Own Numbers
Forty-five minutes on your own jobs.
Bring a recent invoice batch and a live job budget. We’ll show you exactly what BuildMetrx would have flagged.
